2 story, 42 unit Hotel
Supplied Material:
"In fall of 2014, we completed a 42 unit (23,982 Sq Ft) hotel in Mackenzie BC. With using Winton prefab walls, engineered floor and roof trusses, we were able to beat the snow and have the building locked up in 6 weeks with a crew of 6 guys. The framing issues were figured out for us before the product had arrived to site. I will definietly use Winton prefab walls again. " Brent Scheck, Scheck Construction
Phone:250.561.2079
Toll Free:1.888.296.8059
Email: Keith.Annis@wintonhomes.ca
Copyright © 2015. All rights reserved.Privacy Policy