26,000 Sq Ft - Mt. Milligan Mine Site

Administration Building

Supplied Material:

  • Roof Trusses
  • Prefabricated walls (14'x8' panels, 2"x8" Constructions, 5/8 sheathing)
  • Floor Trusses (4x2)

The production schedule for this isolated build location (400km delivery on remote road) was pushed by 3 months into our peak production season. The demand was met by Winton.